Greene County General Hospital CEO, Brenda Reetz, announced today that hospital operations will be unaffected during the final stage of facility repairs during which a section of the ground floor will be closed. The main hallway on the ground floor between the cafeteria and the elevators will be closed through July 7.
The cafeteria will continue to serve as usual, however, visitors will only be able to enter through the main glass doors, opening into the lower level parking lot. The south doors next to the handicapped parking will be closed as will the ground floor restrooms. Public restrooms will be available on the first floor, between the outpatient laboratory and emergency department registration.
“This is the final stage of repairs following the water damage we experienced in May,” said Reetz. “We are working hard to minimize any disruptions for our staff and our visitors.”
Elevators will continue to operate normally, with access on the ground floor limited to the back utility hall. Administrative offices will be relocated within the hospital, and phone numbers will remain unchanged. The parking lots will be unaffected.